Welding in
- Make
- Volkswagen
- Model
- Passat NMS, US and China
- Year
- 2011–2019
- Section
- Mobile online services › Welding in
Electrical: CommunicationWelding in
Welding in
Note
- New part must be welded in within 90 minutes or adhesion of adhesive will be impaired.
- Threaded holes in area of hinge mounting must be free of adhesive.

Apply 2-component body adhesive D 180 003 M2 to areas indicated.
Note
- In the area of the A, B and C-pillars, high tensile, highest tensile and hot formed steels are used. The weld flanges in these areas are about 13 mm wide.
- If spot welds are located at the edge of thermally shaped panels, the high temperature will cause the bond between the panels to change in such a way that crash safety will be impaired.

Therefore, locate spot welds as close to the centre as possible.
Dimension (a) of 8 mm can be achieved using angled welding tips.Adapt new part with vehicle standing on its wheels or alignment bracket set and fix in position.
Check fit with bolt-on parts.
Note
- Note prohibited weld areas (1) where welding is not allowed.

Weld in parting cuts, MIG-L stepped seam or SG continuous weld seam are permitted.
Weld B-pillar to door apertures, RP spot weld seam (inverter).

Weld B-pillar to side member, RP spot weld seam (inverter).
Parts & tools for this job For 2011 Volkswagen Passat
- TOOLDigital multimeterSearch: automotive digital multimeter
- PARTAssorted fuse kitSearch: car fuse assortment kit
- TOOLWire crimper and connector kitSearch: wire crimper connector kit
As an Amazon Associate we earn from qualifying purchases.