Removing and installing
- Make
- Volkswagen
- Model
- Passat NMS, US and China
- Year
- 2011–2019
- Section
- Air conditioner compressor › Removing and installing
Removing and installing
Special tools and workshop equipment requiredAir conditioner service stationUnscrew nuts (arrow).

Remove the refrigerant line securing clamp (1) on the AC compressor (2).
Pump for charge air cooling V188 removing Rep. gr.19Coolant pump/coolant regulation; Electric coolant pump.
Extract refrigerant using air conditioner service station before opening refrigerant circuit. Comply with notes → Chapter.
Remove poly V-belt Rep. gr.13Cylinder block (pulley end); Removing and installing poly V-belt.

Remove noise insulation under engine General body repairs, exteriorRep. gr.66Noise insulation; Assembly overview - noise insulation.
CAUTIONEscaping pressurised refrigerant can cause freezing.Skin and other parts of the body may be frozen.Always wear safety gloves.Always wear safety goggles.Extract refrigerant, and open the refrigerant circuit immediately afterwards.If more than 10 minutes have passed since the refrigerant was extracted, repeat the extraction process before opening the refrigerant circuit. Continued evaporation will cause pressure to develop again in the refrigerant circuit.Remove bolts (22 Nm ± 1 Nm) (1) from air conditioner compressor and separate refrigerant lines from air conditioner compressor.
Remove hexagon bolts (25 Nm) (2) and remove air conditioner compressor.
Note
- Ensure that dowel sleeves (3) are properly seated.
- Observe remarks on installation of air conditioner compressor → Chapter.
Parts & tools for this job For 2011 Volkswagen Passat
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Passat 2011 cabin filter
As an Amazon Associate we earn from qualifying purchases.