Passat V6-3.6L (BLV) (2006)
Firewall: Description and Operation
Bulkhead Materials
*
Materials are stored in box D 004 700.
*
Heat according to manufacturer's instructions using cartridge heater (V.A.G 1939)
*
Observe minimum curing time, refer to => [ Minimum Curing Time ] See: Windows and Glass/Windows/Service and Repair/Removal and
Replacement/Flush Bonded Windows Overview.