Assembly overview - valve timing housing
- Make
- Volkswagen
- Model
- Phaeton 3D
- Year
- 2002–2016
- Section
- Valve timing housing › Assembly overview - valve timing housing
10-cylinder diesel engineAssembly overview - valve timing housing
Assembly overview - valve timing housing

- Gear train assembly
Removing and installing → Chapter. - Valve timing housing
Install with silicone sealant D 176 501 A1Fig.. - 20 Nm
Observe tightening sequence, page → Fig. - 20 Nm
- Seal
Do not additionally oil or grease the oil seal sealing lip.
Before installing, remove oil residue from crankshaft journal using a clean cloth.
Renew.Chapter. - Drive plate
Removing and installing → Chapter - 50 Nm + 1/4 turn (90°) further
Renew. - Washer
- 13 Nm

Apply the bead of sealant onto the clean sealing surface of the valve timing housing as shown.
Tightening sequence for valve timing housing securing bolts.
Tighten securing bolts to 20 Nm in sequence as shown.
Parts & tools for this job For 2002 Volkswagen Phaeton
- PARTEngine gasket setSearch: Volkswagen Phaeton 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.