Installing engine
- Make
- Volkswagen
- Model
- Phaeton 3D
- Year
- 2002–2016
- Section
- Removing and installing engine › Installing engine
Installing engine
Install in reverse order. In the process, note the following:
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- To avoid damage to lines, ensure sufficient clearance to all moving or hot components.
Check whether dowel sleeves for centring engine/gearbox have been fitted in cylinder block, insert if necessary.
Reconnect all lines, hoses and connectors which were separated during removal.
Align starter catalytic converters with the front exhaust pipes → Chapter.
Renew bonded rubber mounting for oil filter housing Item.
Note
- When fitting engine and gearbox to body, it is essential to position engine carrier against body with the aid of scissor-type assembly platform VAS 6131. “Pulling up” engine carrier with securing bolts will damage threads.

Individual parts of positioning tool:
- Dot lasers VAS 6131/17-1
- Adapters M14x1.5 VAS 6131/17-2
- Adapters M12x1.5 VAS 6131/17-3
- Adapters M10 VAS 6131/17-4
Note
- The illustration shows an example. Other available bolting points of the subframe may also be used.
Screw appropriate adapters (A) on left and right into threaded holes for securing subframe to longitudinal member of vehicle.
Screw dot lasers VAS 6131/17-1(B) into adapters (A).
Insert securing bolts (C), centred with bolt heads upwards in appropriate securing points of subframe.
Switch on dot lasers and align scissor-type assembly platform so that the laser beams on left and right strike the bolt heads. After completing alignment, remove dot lasers and adapters.
When installing engine, first raise assembly platform only sufficiently to clip selector lever cable in position.
Raise engine until it contacts the body using scissor-type assembly platform VAS 6131.
Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.
Connect air conditioning system lines and top up refrigerant Heating, air conditioningRep. gr.87.
Fill with power-assisted steering fluid Running gear, axles, steering - front and four-wheel driveRep. gr.48Vane pump; bleeding steering system.
Replenish coolant → Chapter.
Replenish engine oil if necessary.
Connect battery.
Observe required procedures after connecting battery Electrical systemRep. gr.27Battery; Disconnecting and reconnecting battery.
Note
- Perform wheel alignment after the installation of subframe Running gear, axles, steering, front and four-wheel driveRep. gr.44wheel alignment
Check headlight adjustment and correct if necessary MaintenanceBooklet16.1.
Carry out vehicle system test Vehicle diagnostic tester“Guided fault finding”.
Finish the vehicle system test so that any fault entries stored during assembly can be deleted automatically.
Generate the readiness code in combination with a road test.
Observe applicable safety precautions during road test.
Carry out road test.
Then carry out vehicle system test again and rectify any faults which may have occurred.
Parts & tools for this job For 2002 Volkswagen Phaeton
- PARTEngine gasket setSearch: Volkswagen Phaeton 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.