Workshop Manuals Factory service & repair Volkswagen
01 Fuel supply system - Diesel engines02 Fuel supply system - Petrol engines03 10-cylinder diesel engine04 6-cylinder diesel engine (3.0 l engine, common rail)05 6-cylinder injection engine (direct injection)06 12-cylinder injection engine07 6-cylinder injection engine08 8-cylinder injection engine09 Servicing automatic gearbox 01V, front-wheel drive and all-wheel drive10 Repair manual, 5-speed automatic gearbox 01L11 Propshaft and rear final drive12 6-speed automatic gearbox 09F, four-wheel drive13 6-speed automatic gearbox 09L, all-wheel drive14 5-speed automatic gearbox 01L, all-wheel drive15 6-speed manual gearbox 01E, 0A116 5-speed automatic gearbox 01V17 Wheels and Tyres Guide - Standard18 Wheels and Tyres Guide19 Running gear, Axles, Steering, Front and four wheel drive20 Brake systems21 Heating and air conditioning: Auxiliary heater22 Heating, air conditioning23 Electrical: Communication24 Electrical system25 General body repairs, exterior26 General body repairs, interior
Volkswagen Phaeton 3D (2002-2016)07 · 6-cylinder injection engine
07 · Engine

Installing engine

Make
Volkswagen
Model
Phaeton 3D
Year
2002–2016
Section
Removing and installing engine › Installing engine
6-cylinder injection engineInstalling engine

Installing engine

6-speed manual gearbox 01E/0A1

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

Note

  • If a new engine is installed, the 3 bores on the face end (arrows) must be sealed by means of bolts.
N10-10537

Procedure

Install in reverse order. In the process, note the following:

Check whether dowel sleeves for centring engine and gearbox are in cylinder block and install if necessary.

Aligning scissor-type assembly platform

N10-10809
Special tools and workshop equipment requiredPositioning tool VAS 6131/17

Individual parts of positioning tool:

  • Dot lasers VAS 6131/17-1
  • Adapters M14x1.5 VAS 6131/17-2
  • Adapters M12x1.5 VAS 6131/17-3
  • Adapters M10 VAS 6131/17-4

Screw appropriate adapters (A) into threaded holes for securing subframe to longitudinal member on left and right.

Screw dot lasers VAS 6131/17-1(B) into adapters (A).

Insert securing bolts (C), centred with bolt heads upwards in appropriate securing points of subframe.

Switch on dot lasers and align scissor-type assembly platform so that the laser beams on left and right strike the bolt heads. After completing alignment, remove dot lasers and adapters.

Screw in left and right securing pins as shown:

A - For engine support, securing pin VAS 6131/1-6

B - For gearbox bracket, securing pin VAS 6131/1-5

N10-0393

Vehicles with automatic gearbox

When installing engine, first raise assembly platform only enough to allow selector lever cable to be guided into position.

Vehicles with manual gearbox

Check clutch release bearing for wear and renew if necessary 6-speed manual gearbox 01E/0A1Rep. gr.30Repairing clutch release mechanism.

Lightly grease input shaft splines with G 000 100 grease.

When installing engine, first raise scissor-type assembly platform only far enough to facilitate installation of the selector mechanism: 6-speed manual gearbox 01E/0A1Rep. gr.34Repairing selector mechanism; Removing and installing selector mechanism.

Fit hydraulic line to hydraulic clutch slave cylinder and then bleed clutch system 6-speed manual gearbox 01E/0A1Rep. gr.30Repairing clutch control mechanism; Assembly overview - hydraulic system.

Continuation for all vehicles

Install air conditioner compressor Heating, air conditioningRep. gr.87Air conditioner compressor bracket.

Install vane pump for power-assisted steering Running gear, axles, steeringRep. gr.48Vane pump.

Install poly V-belt → Chapter.

Reconnect all lines, hoses and connectors which were separated during removal.

Electrical connections and routing Electrical systemRep. gr.97.

Install catalytic converters/front silencer → Chapter; Removing and installing parts of exhaust system.

Replenish coolant → Chapter.

Note

  • Perform wheel alignment after installing subframe Running gear, axles, steering, front and four-wheel driveRep. gr.44wheel alignment

After completed engine fitting:

Connect Vehicle diagnosis, testing and information system VAS 5052.

Carry out vehicle system test using Vehicle diagnostic tester“Guided functions”.

Finish the vehicle system test so that any fault entries stored during assembly can be deleted automatically.

Generate the readiness code in combination with a road test.

Observe applicable safety precautions during road test.

Carry out road test.

Then carry out vehicle system test again and rectify any faults which may have occurred.

Specified torques

Threaded connectionSpecified torque
Bolts, nutsM610 Nm
M715 Nm
M825 Nm
M1040 Nm
M1260 Nm
Deviations
Engine bracket to engine mounting (bolt)M1040 Nm + 1/4 turn (90°)
Engine mounting to engine carrier (nut)M1030 Nm + 1/4 turn (90°)
Engine carrier to body (bolt)M1290 Nm + 1/4 turn (90°)
Drive shafts to gearbox: Running gear, axles, steeringRep. gr.40Repairing drive shafts; Removing and installing drive shafts.

Parts & tools for this job For 2002 Volkswagen Phaeton

As an Amazon Associate we earn from qualifying purchases.