Workshop Manuals Factory service & repair Volkswagen
01 Running gear02 Body03 Engine04 Vehicle electrics05 Power transmission06 Heating, ventilation, air conditioning07 Clutch and gearbox08 3-cylinder diesel engine09 4-cylinder injection engine (5-valve, turbocharger)10 4-cyl. injection engine with timing chain11 4-cylinder injection engine (5-valve, turbocharger) Volkswagen R GmbH12 4-cylinder injection engine (direct injection)13 3-cylinder injection engine (1.2 l engine, 2V and 4V, EA 111)14 4-cylinder diesel engine with unit injector15 4-cyl. injection engine, 2005»16 4-cyl. injection engine (toothed belt drive)17 5-speed manual gearbox 02T18 4-speed automatic transmission 00119 Automatic gearbox 00120 6-speed automatic gearbox 09G21 5-speed manual gearbox 02R Volkswagen R GmbH22 6-speed manual gearbox 0A823 5-speed manual gearbox 02R24 Wheels and Tyres Guide - Standard25 Brake system26 Running gear, axles, steering27 Brake systems28 Electrical: Communication29 Electrical system30 General body repairs, exterior31 General body repairs, interior32 4-cylinder injection engine33 Heating, air conditioning34 4 cyl. injection engine, (2 valves, roller rocker fingers)35 Electrical system South Africa
Volkswagen Polo Mk415 · 4-cyl. injection engine, 2005»
15 · Engine

Notes on installing

Make
Volkswagen
Model
Polo Mk4
Section
Removing and installing engine › Notes on installing
4-cyl. injection engine, 2005»Notes on installing

Notes on installing

Installation is carried out in the reverse order. When installing, note the following:

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all types of line (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

Insert new dowel sleeves in cylinder block for centring engine and gearbox.

Hook intermediate plate onto sealing flange and slide onto dowel sleeves (arrows).

A10-0129

Lightly lubricate input shaft splines with grease G 000 100.

Check clutch and clutch operating mechanism and install Rep. Gr.30.

Install selector mechanism and adjust cable selector mechanism if necessary Rep. Gr.34.

When installing engine and gearbox assembly, ensure sufficient clearance to subframe and radiator.

Rock engine to align engine mountings stress free.

Note

  • Torque settings for assembly mounting → Chapter.

Install right drive shaft and connect left drive shaft to gearbox Rep. Gr.40.

Install front exhaust pipe → Chapter.

Electrical connections and routing Rep. Gr.97.

Install poly V-belt → Chapter.

Install noise insulation tray Rep. Gr.50.

Fill with coolant → Chapter.

Parts & tools for this job For Volkswagen Polo

As an Amazon Associate we earn from qualifying purchases.