Workshop Manuals Factory service & repair Volkswagen
01 Fuel supply system - Petrol engines02 4-cyl. injection engine with timing chain03 3-cylinder injection engine (1.2 l engine, 4V, EA 111)04 4-cylinder common rail engine (1.5 l, 4V, turbocharger)05 4-cylinder diesel engine (1.6 l engine, common rail)06 4-cylinder direct injection engine (1.2 l engine, 2V, EA 111 turbocharger)07 5-speed manual gearbox 02T08 6-speed automatic gearbox 09G09 6-speed manual gearbox 02U10 5-speed manual gearbox 02R11 7-speed dual clutch gearbox 0AM12 Running gear, axles, steering13 Brake system14 Wheels and Tyres Guide15 Heating, air conditioning16 Electrical system17 Electrical: Communication18 General body repairs, interior19 General body repairs, exterior
Volkswagen Polo Sedan and Vento, India and Malaysia (2010-2020)09 · 6-speed manual gearbox 02U
09 · Transmission

General repair notes

Make
Volkswagen
Model
Polo Sedan and Vento, India and Malaysia
Year
2010–2020
Section
General repair notes › General repair notes
6-speed manual gearbox 02UGeneral repair notes

General repair notes

Power transmission · 6-speed manual gearbox 02U

Applies to: Polo KH IN 2010, Polo KH IN 2015, Polo Lim IN 2011, Polo Lim RUS 2011, Polo Lim RUS 2016 · Edition 05.2015

To ensure flawless and successful gearbox repairs, the greatest care and cleanliness as well as the use of good and proper tools are essential. Of course, the basic rules for safety also apply during repair work.

A number of generally valid instructions applicable for the various repair procedures - which were formerly repeated a number of times at numerous places in the workshop manual - are summarised here. They apply to this workshop manual.

Contact corrosion

  • Bolts and other components in direct contact with the gearbox have surfaces matched to the surface of the gearbox housing.
  • If the incorrect components (bolts, nuts, washers and so on) are used, contact corrosion will develop. The gearbox housing will be damaged.
  • Always install parts listed in the Electronic Parts Catalogue “ETKA”.

Special tools

For a complete list of special tools used in this workshop manual, see Workshop equipment and special tools.

Gearbox

  • When installing the manual gearbox, ensure that the dowel sleeves between the engine and gearbox are correctly seated.
  • When installing mounting brackets or waxed components, clean the contact surfaces. Contact surfaces must be free of wax and grease.
  • Allocate bolts and other components using the Electronic Parts Catalogue (ETKA).
  • After repairing the gearbox, fill with gear oil.

Seals and sealing rings

N32-10016

After removing gaskets and seals, always inspect contact surface of housing or shaft for burrs resulting from removal or for other signs of damage.

  • Thoroughly clean parting surfaces and apply sealant.
  • Allocation Electronic Parts Catalogue (ETKA)
  • Before installing radial oil seals, half-fill space between sealing lips with sealing grease(arrow).
  • Allocate grease using Electronic Parts Catalogue (ETKA).
  • The open side of the oil seal faces the side with fluid filling.
  • Lightly oil O-rings before installing; this prevents the rings being crushed when inserted.

Sealant

  • Thoroughly clean housing joint surfaces before applying sealant.
  • Apply sealant uniformly but not too thick.
  • Allocation Electronic Parts Catalogue (ETKA).
  • Breather holes must remain free of sealant.

Locking devices

N30-10172
  • Renew retaining rings.
  • Do not overstretch retaining rings.
  • Retaining rings must locate properly in grooves.
  • Renew spring pins. Installation position: slot must be in line with direction of force.
  • V34-1515

Nuts and bolts

  • Loosen and tighten securing bolts and nuts for covers and housings diagonally.
  • Do not cant especially delicate parts, such as clutch pressure plates. Loosen and tighten bolts and nuts in stages in a diagonal sequence.
  • Torque settings are specified for unoiled bolts and nuts.
  • Renew self-locking bolts and nuts after each removal.
  • Ensure with threaded connections that contact surfaces as well as nuts and bolts are rewaxed only after assembly, if necessary.
  • Use a thread chaser to clear residual locking fluid from all threaded holes into which self-locking bolts are to be screwed. Otherwise there is a danger of bolts shearing when subsequently being removed.
  • Check pitch of thread, to ensure correct thread chaser is used to clean threads and to ensure the threads are not damaged.

Bearing

  • Lubricate all bearings with gear oil before installing.
  • Install new tapered roller bearings as supplied and do not lubricate additionally.
  • Install needle bearings with lettered side (thicker metal) towards fitting tool.
  • Tapered roller bearings fitted to one shaft must be renewed as a set. Use same make of bearings.
  • Heat inner races to about 100°C with the inductive heater VAS 6414 before installing.
  • Do not interchange outer or inner races of bearings of the same size. The bearings are matched in pairs.

Shims

N30-10156
  • Measure shims at several points with a micrometer. The various thicknesses make it possible to achieve the exact shim thickness required.
  • Check for burrs and damage.
  • Install only flawless shims.

Synchro-rings

N35-10107
  • Do not interchange. When reusing synchro-rings, always fit to the same synchromeshed gear.
  • Check for wear and renew if necessary.
  • Check grooves (arrow 1) of synchro-ring (A) and inner ring for flat spots (worn grooves).
  • If synchro-rings are coated, coating must not be damaged.
  • If an intermediate ring (B) is installed, check the outer friction surface (arrow 2) and inner friction surface (arrow 3) of this intermediate ring for »scoring«, »signs of abnormal wear« and »blue discolouration (due to overheating)«.
  • Check the cone of the synchromeshed gear for »scoring« and »signs of abnormal wear«.
  • Moisten synchromesh mechanism with gear oil before installing.

Gears and synchro-hubs

  • Before installing, clean and heat with the inductive heater VAS 6414 to maximum 100°C.
  • Observe installation position.

Synchromeshed gears

  • After assembly, check synchromeshed gears for slight play, or for freedom of movement.

Clutch operation

Disconnect battery earth strap Electrical systemRep. gr.27Battery; Disconnecting and connecting battery.

When reconnecting battery, refer to Electrical systemRep. gr.27Battery; Disconnecting and connecting battery.

Clutch

  • Ensure that the pressure plate does not cant: loosen and tighten bolts diagonally and in several gradual stages.
  • If the clutch has burnt out, thoroughly clean the clutch housing and the friction surface of flywheel with a cloth to reduce the smell of burnt linings.

Parts & tools for this job For 2010 Volkswagen Polo

As an Amazon Associate we earn from qualifying purchases.