Part II
- Make
- Volkswagen
- Model
- Tiguan Mk1
- Year
- 2007–2016
- Section
- Turbocharger › Part II
4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)Part II
Part II

- 8 Nm
- Coolant pipe
- O-ring
Renew. - Stud, 20 Nm
Coat with high-temperature paste. - Turbocharger
Removing and installing → Chapter.
Checking turbocharger vacuum unit → Chapter.
Removing and installing vacuum unit for turbocharger → Chapter.
Adjusting vacuum unit for turbocharger → Chapter. - Gasket
Renew. - 25 Nm
Renew studs and fastening nuts.
Coat studs with high-temperature paste.Screw studs into cylinder head until they project only by 25 mm.Observe tightening sequence: items (A) to (I). - Coolant pipe
- Gasket
Renew. - 8 Nm
- Oil return pipe
- Banjo bolt, 30 Nm
- Seal
Renew. - Oil supply pipeCautionOil supply line must be renewed when installing a new turbocharger.
- Banjo bolt, 30 Nm
Parts & tools for this job For 2007 Volkswagen Tiguan
- PARTEngine gasket setSearch: Volkswagen Tiguan 2007 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.