Workshop Manuals Factory service & repair Volkswagen
01 6-cylinder injection engine02 8-cylinder injection engine03 6-cylinder diesel engine (3.0 l engine, common rail)04 12-cylinder injection engine05 6-cylinder injection engine (direct injection)06 8-cylinder injection engine (direct injection)07 10-cylinder diesel engine Volkswagen R GmbH08 5-cylinder diesel engine09 10-cylinder diesel engine10 Automatic gearbox 09D Volkswagen R GmbH11 Automatic gearbox 09D12 6-speed manual gearbox 08D13 Transfer box and final drive14 Wheels and Tyres Guide - Standard15 Running gear, axles, steering16 Brake systems17 Supplementary heating18 Heating, air conditioning19 Electrical system20 Electrical: Communication21 General body repairs, interior22 General body repairs, exterior
Volkswagen Touareg Mk1 (2002-2010)07 · 10-cylinder diesel engine Volkswagen R GmbH
07 · Engine

Adjusting valve timing

Make
Volkswagen
Model
Touareg Mk1
Year
2002–2010
Section
Cylinder head › Adjusting valve timing
10-cylinder diesel engine Volkswagen R GmbHAdjusting valve timing

Adjusting valve timing

W15-10043
Special tools and workshop equipment requiredCounterhold T10172Camshaft clamp T10193 for cylinder bank 1Camshaft clamp T10194 for cylinder bank 2Crankshaft clamp T10195Bit XZN 16 T10198Clamp T10199

Procedure

Remove engine and gearbox → Chapter.

Remove fuel and tandem pumps from cylinder heads → Chapter.

Remove noise insulation (Item) and covers (Item) from cylinder heads.

Remove acoustic covers and cylinder head covers .

Turn engine using counterhold T10172 until at least one camshaft clamp can be inserted.

N13-0870

Fit clamp T10199 on gear of clamped camshaft and loosen bolt of camshaft gear. The gear can now be turned freely on the camshaft.

If it was only possible to fit one camshaft clamp:

Turn engine with counterhold T10172 until camshaft clamp for other cylinder bank can be inserted.

Fit clamp T10199 onto camshaft gear wheel and loosen its bolt. This gear can now be turned freely on the camshaft.

Remove vibration damper Item. Use counterhold T10172 with screw pins T10172/1.

Bolt crankshaft clamp T10195 onto crankshaft stump. Note dowel pin when doing this.

N13-0859

Now carefully turn crankshaft until pin of crankshaft clamp T10195 slips into fitting hole.

Fit clamp T10199/1 as shown and tighten its clamping bolt to 70 Nm.

N15-10171

Fit torque wrench (40 to 200 Nm) V.A.G 1332 into the square drive of the clamping tool and exert a force of 80 Nm (opposite to engine direction of rotation) to remove the play from the gear train.

  • Cylinder bank 1: (in direction of arrow)
  • Cylinder bank 2: (in opposite direction to arrow)

Maintain this force and tighten camshaft gear wheel securing bolts to 50 Nm using socket T10198.

Remove clamp T10199/1.

Fit clamp T10199 onto camshaft gear wheel.

N15-10071

Note

  • Ensure the clamp T10199 lies flush with the cylinder head.

Tighten bolts for clamp T10199 to 40 Nm.

Then secure camshaft gear wheel with clamp T10198. Specified torque: 150 Nm + 1/4 turn (90°).

Remove clamp T10199.

Remove locking devices from camshafts and crankshaft.

Turn crankshaft two rotations in engine direction of rotation until crankshaft is set to TDC No. 1 cylinder again.

Check that the camshaft clamp as well as the crankshaft clamp can be inserted at the same time.

N13-0859

Check position of pump plungers in unit injectors → Chapter.

Parts & tools for this job For 2002 Volkswagen Touareg

As an Amazon Associate we earn from qualifying purchases.