Adjusting valve timing
- Make
- Volkswagen
- Model
- Touareg Mk1
- Year
- 2002–2010
- Section
- Chain drive › Adjusting valve timing
Adjusting valve timing
(Removal and installation of timing chains; only possible with engine removed).

Note
- The following procedure can only be performed only with engine removed. You can start with adjustments at the relevant point, depending on how far the engine has been dismantled.
- If timing chain has already been used, note marking for direction of rotation → Fig..
- Timing chains must run completely straight in guide and tensioner rails.
- Ensure that all chain sprocket securing bolts are renewed.
Turn crankshaft to TDC No. 1 cylinder.

Marking (1) must align with cylinder block joint (2).
The camshaft bar T10068 A must engage in grooves in both shafts.

Note
- If necessary, turn camshafts (arrows) slightly to the correct position, using a 32 mm open-end spanner.

Warning Never turn camshafts more than 1/4 turn with cylinder heads fitted and locked crankshaft! The valves could contact the piston!
If camshaft bar T10068 A cannot be inserted, turn camshaft one revolution further in direction of engine rotation. It must now be possible to insert camshaft bar T10068 A.
Note
- The camshaft bars T10068 A must stay inserted into the shaft grooves throughout the entire working procedure.
Now, remove screw plug Item from bottom left of cylinder block.
Screw clamping bolt 3242 into hole so that crankshaft is secured against turning.

If intermediate shaft has been removed:
Install intermediate shaft mounting with notch facing upwards (arrow), and secure it through tightening new bolts to 15 Nm.

Copper chain link (arrow A) must be flush with cylinder block joint (1).

The copper link (arrow B) must be positioned at the marking at the top of the intermediate shaft chain sprocket (1).
If timing chain is aligned parallel to guide rail (3) it should be possible to press in intermediate shaft (2) in (direction of arrow).

Now, bolt on chain tensioner (3) with locking plate. Specified torque: 8 Nm

Tighten new securing bolt of intermediate shaft with “left-hand thread”(1) hand-tight.

Counterhold vibration damper with counter-hold tool T10069, thereby ensuring not to turn crankshaft.

Now, tighten bolt with “left-hand thread” on intermediate shaft to 60 Nm + 90° (1/4 turn).
Remove counter-hold tool T10069.
Fit first copper link of timing chain (1) onto intermediate shaft (arrow) so that both copper links are aligned in exact succession.

Attach guide rail (6).

Note
- The camshaft adjuster can be turned in two directions. Before installing, ensure that the sender wheel (1) for the Hall sender is turned to respective stop.
Turn sender wheel (1) in direction of arrow to stop and hold it in this position.

Fit second copper link of camshaft timing chain (arrow) onto adjuster as shown. While doing so, ensure copper link is aligned against marking arrow (1) present on inlet camshaft adjuster.

It must now be easy to fit the inlet camshaft adjuster onto the camshaft and tighten it hand-tight.
The two copper links (arrow A) must still be exactly aligned on top of the chain sprocket of the intermediate shaft (4) and the chain must lie “tightly” against the guide rail (6).

Now, fit third copper link of camshaft timing chain (arrow) onto exhaust camshaft adjuster as shown. Ensure that copper link is aligned against arrow (1) present on exhaust camshaft adjuster. It must now be easy to fit the adjuster onto the camshaft and tighten it hand-tight.

Now, insert tensioning rail (7).

Note
- The three copper chain links of the timing chain for cylinder bank 2 which is to to be installed now are only visible from rear.
Fit first copper link of timing chain (1) onto intermediate shaft so that all three copper links are aligned in exact succession (arrow).

Now, attach guide rail (6). Guide chain from intermediate shaft “tightly” over it.

Fit second copper chain link (arrow) onto marked tooth “B2” of exhaust camshaft adjuster (1). It must now be easy to fit the adjuster onto the exhaust camshaft and tighten it hand-tight.

Ensure that timing chain (1) is lying tightly against guide rail (6) and does not hang at any point.

Now, install cylinder bank 2 inlet camshaft adjuster as follows:
Note
- The inlet camshaft adjuster can be turned in two directions. Before installing, ensure that the sender wheel (1) for the Hall sender is turned to stop.
Turn sender wheel (1) for Hall sender in (direction of arrow) to stop and hold it in this position.

Fit copper chain link (arrow) onto marked tooth “B2” of inlet camshaft adjuster (1). It must now be easy to fit the adjuster onto the inlet camshaft and tighten it hand-tight.

Fit tensioning lever (7) onto corresponding guide pin.

Install stop for chain tensioner in tensioning lever (arrow). Specified torque: 20 Nm
Install chain tensioner (1) (still secured by drill bit). Specified torque: 9 Nm

Press tensioning lever in (direction of arrow) and release chain tensioner (1) by pulling out drill bit.

Now again, ensure that every copper chain link is in correct position.
Remove camshaft bar T10068 A.
Tightening camshaft adjuster:
Note
- Counterhold only with 32 mm open-end spanner on respective camshaft (arrows). The camshaft bar T10068 A must not be fitted when camshaft adjuster is loosened or tightened.

Tighten all four securing bolts for camshaft adjusters (2) to 60 Nm + 90° (1/4 turn; turning further can be done in several steps).

Remove locking pin 3242.

Install sealing plug in cylinder block. Specified torque: 20 Nm
Renew seal in drive plate sealing flange Item.
Install drive plate sealing flange Item.
Note
- Observe expiry date of sealing compound.
Clean sealing surfaces in cover (1) as well as sealing surface of sealing flange for drive plate. They must be free of oil and grease.
Cut off tube nozzle of sealant D 176 501 at forward marking (∅ of nozzle approx. 2 mm).

Apply sealant as shown to clean sealing surface of cover to cylinder head and to sealing surface to rear sealing flange (2). Sealant bead must be:
- approx. 2 mm thick
- Run bead along inner side of bolt holes (arrows).
Lubricate O-ring for oil passage seal (3) (only cylinder bank 1) and insert into cover (1).

Note
- The cover must be installed within 5 minutes after applying sealant.
Fit cover and all securing bolts immediately and tighten bolts slightly:
First, tighten bolts for securing cover to sealing flange. Specified torque: 8 Nm
Then, tighten cover/cylinder head securing bolts alternately and diagonally, working from centre outwards. Specified torque: 8 Nm
Remove excess sealant.
Install tensioner for camshaft timing chain (arrow). Specified torque: 40 Nm

Installing cylinder head cover → Chapter.
Parts & tools for this job For 2002 Volkswagen Touareg
- PARTEngine gasket setSearch: Volkswagen Touareg 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.