Workshop Manuals Factory service & repair Volkswagen
01 6-cylinder injection engine02 8-cylinder injection engine03 6-cylinder diesel engine (3.0 l engine, common rail)04 12-cylinder injection engine05 6-cylinder injection engine (direct injection)06 8-cylinder injection engine (direct injection)07 10-cylinder diesel engine Volkswagen R GmbH08 5-cylinder diesel engine09 10-cylinder diesel engine10 Automatic gearbox 09D Volkswagen R GmbH11 Automatic gearbox 09D12 6-speed manual gearbox 08D13 Transfer box and final drive14 Wheels and Tyres Guide - Standard15 Running gear, axles, steering16 Brake systems17 Supplementary heating18 Heating, air conditioning19 Electrical system20 Electrical: Communication21 General body repairs, interior22 General body repairs, exterior
Volkswagen Touareg Mk1 (2002-2010)01 · 6-cylinder injection engine
01 · Engine

Assembly overview - removing and installing cover

Make
Volkswagen
Model
Touareg Mk1
Year
2002–2010
Section
Cylinder head › Assembly overview - removing and installing cover
6-cylinder injection engineAssembly overview - removing and installing cover

Assembly overview - removing and installing cover

Installing cover seals → Chapter.

Note

  • The cover can be removed or installed only with the engine removed.

N15-0673
  • Cable guide
    For wiring harness.
  • 8 Nm
  • 8 Nm
  • Hall sender 2 G163
    For exhaust camshaft.
    Before removing, mark connector belonging to component.
  • Chain tensioner, 40 Nm
    For camshaft timing chain Item
    Only rotate engine when chain tensioner is installed.
  • Seal
    Renew if damaged or leaking.
  • 8 Nm
  • Seal
    For inlet camshaft control valve 1 N205Item and exhaust camshaft control valve 1 N318Item
    Renew if damaged or leaking.
    Installing → Chapter.
  • Bracket
    For continued coolant circulation pump V51
    For activated charcoal filter system solenoid valve 1 N80.
  • Thermostat housing
    Coolant hose schematic diagram → Chapter.
  • 23 Nm
  • Seal
    Renew if damaged or leaking.
  • Cover
    Preparing cylinder head gasket for assembly → Fig..
  • Hall sender G40
    For inlet camshaft.
    Before removing, mark connector belonging to component.
  • O-ring
    For sealing oil channel.
    Renew.
    Lubricate before installing.
Preparing cylinder head gasket for assembly
N15-0425
Special tools and workshop equipment requiredSealant D 176 501 A1

Procedure

Remove old sealant from 3 mm holes in cylinder head gasket (arrows).

Fill 3 mm holes in cylinder head gasket with sealant D 176 501 A1 and coat sealing surfaces on cover and sealing flange with sealant D 176 501 A1. Fit cover immediately.

Note

  • With the cylinder head installed, the holes in the cylinder head gasket are only half visible.

Parts & tools for this job For 2002 Volkswagen Touareg

As an Amazon Associate we earn from qualifying purchases.