Workshop Manuals Factory service & repair Volkswagen
01 6-cylinder injection engine02 8-cylinder injection engine03 6-cylinder diesel engine (3.0 l engine, common rail)04 12-cylinder injection engine05 6-cylinder injection engine (direct injection)06 8-cylinder injection engine (direct injection)07 10-cylinder diesel engine Volkswagen R GmbH08 5-cylinder diesel engine09 10-cylinder diesel engine10 Automatic gearbox 09D Volkswagen R GmbH11 Automatic gearbox 09D12 6-speed manual gearbox 08D13 Transfer box and final drive14 Wheels and Tyres Guide - Standard15 Running gear, axles, steering16 Brake systems17 Supplementary heating18 Heating, air conditioning19 Electrical system20 Electrical: Communication21 General body repairs, interior22 General body repairs, exterior
Volkswagen Touareg Mk1 (2002-2010)05 · 6-cylinder injection engine (direct injection)
05 · Engine

Installing engine

Make
Volkswagen
Model
Touareg Mk1
Year
2002–2010
Section
Removing and installing engine › Installing engine
6-cylinder injection engine (direct injection)Installing engine

Installing engine

6-speed manual gearbox 08D

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

Note

  • When fitting engine and gearbox to body, it is essential to position engine carrier against body with the aid of scissor-type assembly platform VAS 6131. »Pulling up« engine carrier with securing bolts will damage threads.

Procedure

Install in reverse order. In the process, note the following:

Vehicles with manual gearbox

Check clutch release bearing for wear and renew if necessary 6-speed manual gearbox 08DRep. gr.30Repairing clutch release mechanism.

Lightly grease input shaft splines with grease G 000 1000.

Continuation for all vehicles

Check whether dowel sleeves for centring engine and gearbox are in cylinder block and install if necessary.

If subframe with engine carrier has been removed from scissor-type assembly platform:

Position subframe with engine carrier onto prepared scissor-type assembly platform again.

N10-0431

Set engine on subframe.

If gearbox is not yet bolted on:

Support engine with support VAS 6131/7.

Bolt on gearbox Removing and installing gearboxRep. gr.34.

Vehicles with manual gearbox

When installing engine, first raise scissor-type assembly platform only far enough to install slave cylinder for hydraulic clutch 6-speed manual gearbox 08DRep. gr.30Repairing clutch mechanism; Assembly overview - hydraulics.

Vehicles with automatic gearbox

When installing engine, first raise scissor-type assembly platform only sufficiently to clip selector lever cable in position.

Top up ATF level Automatic gearbox 09DRep. gr.37Checking ATF level and topping-up.

Continuation for all vehicles

Reconnect all lines, hoses and connectors which were separated during removal.

Reconnect air conditioning system lines Heating, air conditioning systemRep. gr.87.

Fill with power-assisted steering fluid Running gear, axles, steeringRep. gr.48Vane pump; Bleeding steering system.

Replenish engine oil if necessary → Chapter or: MaintenanceBooklet17.1.

Install selector lever 6-speed manual gearbox 08DRep. gr.34Repairing selector mechanism.

Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.

Replenish coolant → Chapter.

Note

  • Perform wheel alignment after the installation of subframe Running gear, axles, steering, front and four-wheel driveRep. gr.44Wheel alignment.

Carry out road test and read all fault memories Vehicle diagnostic tester.

Observe applicable safety precautions during road test → Chapter.

Specified torques

Threaded connectionSpecified torque
Bolts, nutsM610 Nm
M715 Nm
M825 Nm
M1040 Nm
M1260 Nm
Deviations
Engine bracket to engine mounting (nut)M1075 Nm
Engine mounting to engine carrier (bolt)M1060 Nm
Engine carrier to body (bolt)M14120 Nm + 1/2 turn (180°).
Drive shafts to gearboxRunning gear, axles, steering - front and four-wheel driveRep. gr.40Repairing drive shaft
Gearbox carrier to bodyDifferential and final driveRep. gr.34Installing gearbox carrier and console.

Parts & tools for this job For 2002 Volkswagen Touareg

As an Amazon Associate we earn from qualifying purchases.