Guide rail - bolting sequence
- Make
- Volkswagen
- Model
- Touareg Mk1
- Year
- 2002–2010
- Section
- Roof rack › Guide rail - bolting sequence
General body repairs, exteriorGuide rail - bolting sequence
Guide rail - bolting sequence
Note
- The specified bolting sequence must strictly be maintained.

Bolting sequence, first bolt (1) and then bolt (2), must be observed.
The remaining the bolts (3) can then be tightened in any order.
Specified torque for bolts: 10 Nm.
Parts & tools for this job For 2002 Volkswagen Touareg
- TOOLTie rod end toolSearch: tie rod end puller
- TOOLBall joint separatorSearch: ball joint separator
- FLUIDPower steering fluidSearch: Volkswagen power steering fluid
As an Amazon Associate we earn from qualifying purchases.