Removing and installing cylinder head
- Make
- Volkswagen
- Model
- Transporter T5
- Year
- 2003–2015
- Section
- Cylinder head › Removing and installing cylinder head
Removing and installing cylinder head
Special tools and workshop equipment requiredTorque wrench V.A.G 1331 (5...50 Nm)Torque wrench V.A.G 1332 (40 ... 200 Nm)Special wrench, long reach T10061Drain coolant → Chapter.
Move lock carrier into service position: General body repairs, exteriorRep. gr.50Body - front; Lock carrier - service position.
Remove charge air pipes between charge air cooler/turbocharger and charge air cooler/intake connecting pipe.
Remove intake manifold → Chapter.
Remove exhaust gas recirculation connecting pipe.
Remove engine cover panel and cylinder head cover Item.
Note
- Only both bolts to cylinder head must be removed.
Remove securing bolts of valve timing housing cover to cylinder head → Chapter.
Remove tandem pump Rep. gr.20Fuel pump.
Unscrew turbocharger/exhaust manifold securing bolts → Chapter.
Disconnect all necessary coolant and vacuum hoses as well as electrical connections on cylinder head.
Remove upper coolant pipe.
Turn engine to TDC no. 1 cylinder → Chapter.
Remove camshaft drive gear → Chapter.
Maintain sequence when loosening and tightening cylinder head bolts.

Installation is carried out in the reverse order; note the following:
Note
- Different thicknesses of cylinder head gasket are fitted depending on the piston projection. When replacing the cylinder head gasket, install a new gasket with the same identification (note number of holes on right next to part number).
- Always renew cylinder head bolts.
- In cases of repair carefully remove gasket remains from cylinder head and cylinder block. Ensure that no long scores or scratches are made on the surfaces. When using abrasive paper do not use a grade less than 100.
- Carefully remove remains of emery and abrasives.
- Do not remove new cylinder head gasket from packaging until it is ready to be fitted.
- Handle gasket very carefully. Damage to the silicone coating or the indented area will lead to leaks.
Position cylinder head gasket.
Fit cylinder head, install cylinder head bolts and tighten hand tight.
Tighten cylinder head in 6 stages in sequence shown as follows:

Tighten initially with torque wrench:
Stage I = 60 Nm
Turn further with rigid spanner:
Stage II = 1/4 turn (90°)
Stage III = 1/4 turn (90°)
Stage IV = 1/4 turn (90°)
Stage V = 1/4 turn (90°)
Turning back with rigid spanner:
Stage VI = loosen all cylinder head bolts 1/4 turn (90°).
Install camshaft drive gear → Chapter.
Replenish coolant → Chapter.
Screw turbocharger tight → Chapter.
Install charge air pipes between charge air cooler/turbocharger and charge air cooler/intake connecting pipe.
Install intake manifold
Install exhaust gas recirculation connecting pipe.
Install cylinder head cover and engine cover panel Item.
Carry out road test and read event memory Vehicle diagnostic tester.
Parts & tools for this job For 2003 Volkswagen Transporter
- PARTEngine gasket setSearch: Volkswagen Transporter 2003 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.