Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder diesel engine03 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)04 Fuel supply system - Petrol engines05 Fuel supply system - Diesel engines06 4-cylinder injection engine (2.0 l engine)07 6-cylinder injection engine08 5-cylinder diesel engine09 7-speed dual clutch gearbox 0BT10 6-speed manual gearbox 0A511 5-speed manual gearbox 02Z12 Propshaft and rear final drive13 Automatic gearbox 09K14 Running gear: Guide for using trailers15 Wheels and Tyres Guide - General Information16 Running gear: Guide for increasing and decreasing load ratings17 Wheels and Tyres Guide18 Running gear, axles, steering19 Brake systems20 Heating and air conditioning: Auxiliary heater21 Heating, air conditioning22 Electrical System, General Information23 Electrical: Communication24 Electrical system25 General body repairs, exterior26 General body repairs, interior27 Vehicle-specific paint information28 General body repairs - California
Volkswagen Transporter T5 (2003-2015)08 · 5-cylinder diesel engine
08 · Engine

Assembly overview - turbocharger

Make
Volkswagen
Model
Transporter T5
Year
2003–2015
Section
Turbocharger › Assembly overview - turbocharger
5-cylinder diesel engineAssembly overview - turbocharger

Assembly overview - turbocharger

Note

  • All hose connections are secured with clamps or retaining clips.
  • Charge air system must be free of leaks.
  • Renew self-locking nuts.
  • After installing turbocharger run engine for approx. 1 minute at idling speed, do not rev engine. This ensures that the turbocharger/compressor is adequately lubricated.

N21-10137
  • Bracket
  • Exhaust gas recirculation cooler
  • Gasket
    Renew after removing
  • Exhaust gas temperature sender 1 G235
    Lubricate thread of sender using high-temperature paste G 052 112 A3
    Removing and installing → Chapter.
    45 Nm
  • Bolts
    Renew after removing
    Do not greaseTightening sequence:Tighten bolts by hand.Tighten bolts one by one to 30 Nm in 90° stepsTurn bolts 180° further
  • Washer
  • Gasket
    Renew after removing
    Note installation position.
  • Exhaust manifold
    To remove, remove turbocharger → Chapter, Item and loosen exhaust gas recirculation cooler. Do not open cooling circuit.
  • Nut
    Renew after removing
    25 Nm
  • Flange upper part
    Renew after removing
  • Gasket
    Renew after removing
    Note installation position.
  • Connecting hose
    From air filter.
  • Clip
  • Vacuum line
  • Hexagon nut
    Renew after removing
    40 Nm + 90°
  • Bolt
    Renew after removing
    40 Nm + 90°
  • Turbocharger
    Removing and installing → Chapter.
  • Gasket
    Renew after removing
    Note installation position.
  • Clamp
    7 Nm
  • Particulate filter
  • Gasket
    Renew after removing
    Note installation position.
  • Flange lower part
    Renew after removing
  • Seal
    Renew after removing
    Note installation position.
  • Bracket upper part
  • Vacuum actuator
    For bypass flap
    Renew only together with exhaust gas recirculation cooler
  • Bolt
    Renew after removing
    15 Nm

Parts & tools for this job For 2003 Volkswagen Transporter

As an Amazon Associate we earn from qualifying purchases.