Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder diesel engine03 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)04 Fuel supply system - Petrol engines05 Fuel supply system - Diesel engines06 4-cylinder injection engine (2.0 l engine)07 6-cylinder injection engine08 5-cylinder diesel engine09 7-speed dual clutch gearbox 0BT10 6-speed manual gearbox 0A511 5-speed manual gearbox 02Z12 Propshaft and rear final drive13 Automatic gearbox 09K14 Running gear: Guide for using trailers15 Wheels and Tyres Guide - General Information16 Running gear: Guide for increasing and decreasing load ratings17 Wheels and Tyres Guide18 Running gear, axles, steering19 Brake systems20 Heating and air conditioning: Auxiliary heater21 Heating, air conditioning22 Electrical System, General Information23 Electrical: Communication24 Electrical system25 General body repairs, exterior26 General body repairs, interior27 Vehicle-specific paint information28 General body repairs - California
Volkswagen Transporter T5 (2003-2015)07 · 6-cylinder injection engine
07 · Engine

Adjusting valve timing

Make
Volkswagen
Model
Transporter T5
Year
2003–2015
Section
Chain drive › Adjusting valve timing
6-cylinder injection engineAdjusting valve timing

Adjusting valve timing

Note

  • (Installing roller chain, procedure is possible only with engine removed.)

W13-10004
Special tools and workshop equipment requiredCamshaft bar T10068 ACounterhold T10069Torque wrench V.A.G 1331Torque wrench V.A.G 1332

Not illustrated:

Sealant AMV 174 004 01Sealant AMV 176 501

Procedure

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

Note

  • The following procedure is described with engine removed. You can start with adjustments at the relevant point, depending on how far the engine has been dismantled. The sump is removed and may only be fitted after installing the sealing flange.

Install roller chain and chain tensioner with tensioning plate for intermediate shaft drive:

Adjust position of crankshaft relative to intermediate shaft. The ground down tooth of drive sprocket (B) must be flush with bearing joint (TDC No. 1 cylinder).

N13-0584

Install both pins without collar for guide rail (2), and tighten them.

Note

  • If roller chain has already been used, note marking for direction of rotation → Fig..

Install guide rail (2) with roller chain (1) and both chain sprockets (3) and (4). Marking on roller chain sprocket (4) must align with notch (C) or (D) on thrust washer of intermediate shaft.

When installing, ensure that roller chain runs completely straight in guide rail from crankshaft to intermediate shaft.

Tighten bolts for chain sprockets (3) and (4) on intermediate shaft by hand.

Note

  • Note that all sprocket securing bolts must be renewed.

Now install chain tensioner on opposite side.

To do this, release locking teeth of chain tensioner (A) with a small screwdriver and press tensioning plate against chain tensioner.

Install chain tensioner in this position, and tighten it.

Lock vibration damper using counterhold T10069.

N13-0559

Tighten new securing bolt for intermediate shaft chain sprockets (3) and (4).

N13-0584

Remove counterhold T10069.

Check again position of crankshaft (B) relative to intermediate shaft (C) or (D).

Set engine to TDC No. 1 cylinder again.

Install camshaft drive roller chain:

Now position camshafts in cylinder head at TDC No. 1 cylinder.

Note

  • If necessary, turn camshafts (arrow) to correct position using 32 mm open-end spanner. Camshaft bar T10068 A must be removed while this is done.
N15-10384

It must now be possible to insert camshaft bar T10068 A in both shaft grooves.

N15-10106

Note

  • If cylinder head has been removed:
  • Installing cylinder head → Chapter.
  • The camshaft bar T10068 A remains fitted.

Lay camshaft timing chain over intermediate shaft chain sprocket.

Route chain between tensioning bar and guide rail in direction of valve timing housing.

First install inlet camshaft adjuster as follows:

Note

  • Both camshaft adjusters (marking: “24E” on inlet side and “32A” on exhaust side) can be screwed at camshaft mounting in one position only (arrows) due to a dowel pin.
N15-0433

Turn sender wheel (1) on inlet camshaft adjuster onto right stop (arrow) and tighten hand-tight in this position with camshaft timing chain laid on inlet camshaft.

N13-0816

Note

  • If inlet camshaft adjuster is bolted to the camshaft, turn adjuster with chain sprocket to left accordingly and then fit camshaft timing chain. The marking “24E” or “32A” must always align with notch in control housing.

Ensure the camshaft timing chain is »tight« against the guide rail (1) and does not »sag«.

N15-0432

The marking “24E”(A) on camshaft adjuster must align with notch (arrow) in valve timing housing (C).

N13-0661

Now count exactly 16 rollers to right on timing chain starting from marking “24E” on adjuster, and mark this roller with a coloured pen.

Now turn exhaust camshaft adjuster sender wheel (1) to right stop (arrow) and hold adjuster with sender wheel in this position.

N13-0815

Now insert the positioned exhaust camshaft adjuster with marking “32A” in camshaft timing chain so that the 16 rollers counted lie exactly between markings “24E” and “32A”(1) and (2).

N13-0661

Now fit exhaust camshaft adjuster on exhaust camshaft and tighten it hand-tight.

Remove camshaft bar T10068 A.

Turn crankshaft two full turns in direction of engine rotation and check valve timing → Chapter.

Note

  • When the crankshaft is turned, the tensioner plate must be pressed against the camshaft timing chain by hand instead of with chain tensioner.

Check adjustment again.

If the markings do not align:

Repeat valve timing adjustment.

If the markings align:

Hold camshaft which is to be tightened using a 32 mm open-end spanner (arrow).

N15-10384

Note

  • Camshaft bar T10068 A must be removed while this is done.

Tighten new securing bolts (3) of inlet and exhaust camshaft adjusters (4) and (2) (turning further can be done in several steps).

N15-0431

Now install sealing flange Item as follows:

Clean sealing surface of sealing flange and coat with sealant AMV 176 501.

Insert fitting tool T10122/2 into seal → Chapter.

Slide seal over fitting tool T10122/2 and onto crankshaft journal and sealing flange further onto cylinder block.

Note

  • Observe dowel pins in cylinder block.

Tighten securing bolts.

Remove fitting tool T10122/2 from crankshaft journal.

Now prepare cylinder head gasket for assembly → Fig..

Coat sealing surface of cover with sealant AMV 174 004 01.

Lubricate O-ring for oil channel seal and insert into cover.

Install cover, insert all securing bolts and counterhold lightly.

First, tighten securing bolts M8. Then, tighten securing bolts M6.

Install chain tensioner for camshaft timing chain, and tighten it.

Turn crankshaft two full turns in direction of engine rotation and check valve timing again.

Install thermostat housing.

Install cylinder head cover and intake manifold → Chapter.

Specified torques

  • Chapter“Assembly overview - cylinder head”
  • Chapter“Assembly overview - timing chain”
  • Chapter“Assembly overview - cylinder block”

Parts & tools for this job For 2003 Volkswagen Transporter

As an Amazon Associate we earn from qualifying purchases.