Upper crankcase - remove and install
- Make
- Volkswagen
- Model
- Up! Brazil-market up!
- Year
- 2014–2021
- Section
- Crankcase/oil pump › Upper crankcase - remove and install
Upper crankcase - remove and install
Special tools and workshop equipment requiredOil filter socket 3417 or Oil filter remover (14 faces) VW 5005P


Drain engine oil.
Release and remove the oil filter using the Oil filter socket 3417 or Oil filter remover (14 faces) VW 5005P.
Remove the Poly-V belt → Chapter.
Remove the air conditioning compressor: Heating, air conditioningRep. gr.87Air conditioning (without disconnecting the hoses), and attach it to the front panel.
Note
- Air conditioning lines must not be disconnected.
- Avoid damages to the capacitor and refrigerant lines.
- Do not stretch, fold, or twist rigid or flexible lines.
Remove the fastening bolts (arrows) from the gearbox.

Remove the lower oil crankcase → Chapter.
Remove all fastening bolts (arrows) from the upper crankcase.

Note
- The oil sump is sealed with Silicone sealant D 176 501 A1.
- The Silicone sealant D 176 501 A1 has high adhesive power once it is hardened.
Carefully remove the upper oil crankcase from the cylinder block using a spatula in lever motions (arrow).

Remove oil crankcase.
Remove the remaining Silicone sealant D 176 501 A1 in the cylinder block using a flat spatula.
Remove the remaining Silicone sealant D 176 501 A1 on the upper oil crankcase with a plastic rotary brush.

Warning Wear protective glasses.
Clean the sealing surfaces. They must be free of oil and grease.
Note
- Observe the use-by date for the Silicone sealant D 176 501 A1.
- The crankcase must be installed within 5 minutes after applying the Silicone sealant D 176 501 A1.
- The crankcase may be easily and safely installed by putting M 6 threaded pins in two points in the upper crankcase.
Cut the pipe injector on front marking (∅ of injector is approx. 3 mm).

Apply the Silicone sealant D 176 501 A1, as shown, onto clean sealing surface of the upper crankcase.
- 2 .. 3 mm thick
- Applied over the inner side (arrow), next to the holes.
Note
- The sealant cord cannot be thicker, or else the excessive sealant can go to the oil pan and obstruct the oil suction tube sieve.
Immediately install the crankcase and insert all bolts without final torque.
Follow the torque sequence → Fig.
Note
- Once the oil crankcase is installed, the Silicone sealant D 176 501 A1 must be allowed to dry for approx. 30 minutes. Only then must the engine oil be filled.
Install the lower oil crankcase.
Install the oil filter → Chapter.
Install the air conditioning compressor Heating, air conditioningRep. gr.87Air conditioning.
Install Poly-V belt → Chapter.
Refill with engine oil.
Parts & tools for this job For 2014 Volkswagen Up!
- PARTOil filterSearch: Volkswagen Up! 2014 oil filter
- TOOLOil filter wrenchSearch: oil filter wrench
- FLUIDEngine oilSearch: Volkswagen Up! engine oil
As an Amazon Associate we earn from qualifying purchases.