Intake manifold - assembly overview
- Make
- Volkswagen
- Model
- Up! Brazil-market up!
- Year
- 2014–2021
- Section
- Intake manifold › Intake manifold - assembly overview
3 - Cyl. injection engineIntake manifold - assembly overview
Intake manifold - assembly overview

- 7 Nm
3 units. - Throttle valve control unit J338
Clean → Chapter.
6-pin connector.
Gold-plated contacts.
Remove and install → Chapter.
In case of replacement, adapt the Engine control unit J623 to the Accelerator butterfly valve control unit J338; Vehicle diagnostic tester“Assisted function”. - Locking ring
Replace in case of damages. - 8 Nm
5 units. - 7 Nm
From the fuel rail. - Intake manifold pressure sensor G71 with Air intake temperature sensor G42
Remove and install → Chapter.
Repair solution in case of fitting tab absence → Chapter.
In case of bolted joint: 3 Nm.
4-pin connector.
Gold-plated contacts. - Locking ring
Replace in case of damages. - Intake manifold
Remove and install → Chapter. - 20 Nm
- Locking ring
Replace in case of damages. - Locking ring
Replace in case of damages.
Parts & tools for this job For 2014 Volkswagen Up!
- PARTEngine gasket setSearch: Volkswagen Up! 2014 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.