Drive shaft - remove and install.
- Make
- Volkswagen
- Model
- Up! Brazil-market up!
- Year
- 2014–2021
- Section
- Drive shaft › Drive shaft - remove and install.
Drive shaft - remove and install.


Warning When the fastening nuts (dodecagonal ) of the drive shafts are loosened from the external sides of their wheels, the wheel hub and bearing set must not be overloaded. Therefore, the vehicle's wheels must be suspended.
If the wheel bearings are overloaded with the vehicle's weight, they will be prematurely damaged. As a result, the service life of the wheel bearings will be reduced.
The drive shaft bolt may be loosened by up to 90º if the vehicle's wheels are not suspended.
Vehicles without drive shaft may not move; otherwise, the wheel bearing may be damaged. If such vehicles are moved, observe the following instructions:
- Install an exterior joint in place of the drive shaft.
- Tighten the exterior joint to 120 Nm.
Lift the vehicle until the front wheels have no cargo.
Loosen the twelve-point nut from the drive shaft.
Loosen the wheel bolts.
Raise the vehicle.
Disassemble the wheel.
Loosen the nuts (arrows).

Remove the swivel joint wishbone.
Drain the gearbox oil (arrow)Rep. gr.34Gearbox oil; Gearbox oil - drain and fill.

Place the wedge T10161(1) between the gearbox housing and the triple roller joint.

Press the internal joint out from the gearbox by hitting the rubber hammer over the wedge T10161.
Warning Ensure the internal articulation does not impact the sealing circlip.
Remove gearbox drive shaft.
Install the sealing cap T10381/1 in the gearbox.

Pull and remove the drive shaft from the wheel bearing.
Before using the puller 3283 A, ensure that the pressure part (1) is inserted.


Fasten the puller 3283 A(1) to the wheel hub with 2 wheel bolts.
The indicated sequence must be maintained.

Note
- Upon the end of the task, the fuse must be replaced into initial position, in order to be used with hydraulic effect!
If necessary, remove paint and/or corrosion residues in the external joint thread/splines.
Insert the new circlip on the drive part pin groove.
Operate the external and internal joints of the gearbox and drive part.
Manually push the drive shaft until the drive part stop.
Next, »push« the drive part in the gearbox.
The drive part movement path may be used for this »offset«. Do not excessively pull the drive shaft from the drive part.
Warning Hammers or other impact tools must not be used any under circumstance!
Check proper drive shaft seating, placing the drive part against the circlip resistance.
The deflector ring must (1) be completely secured to the external joint.

Note
- The deflector ring's shoulders (1) must point towards the external joint.
- The deflector ring (1) must be placed on the external joint's contact surface (arrow) .
Note
- In case the deflector ring (1) is not properly placed or has fallen from the external joint, it must be inserted with a pressure part T10049 on the external joint, until reaching the stop.

Insert the external joint as far as possible into the wheel hub splines.
Use the new nuts to screw the swivel joint with the wishbone (arrows).

Install the wheel and tighten → Chapter.
Lubricate the thread, the multi-point socket head bolt, and the wheel hub/twelve-point nut contact surface with Fuchs Renolin B15 VG46 pressure-resistant oil.
Fasten the twelve-point nut from the drive shaft.
Note
- For such, the vehicle must be suspended; otherwise, the wheel bearing box will be damaged.
Top off the gearbox oil Rep. gr.34Gearbox oil; Gearbox oil - drain and fill.
| Component | Tightening torque |
|---|---|
| Swivel joint to wishboneUse new bolts. | 100 Nm |
| Drive shaft twelve-point nutUse new nuts. | 50 Nm 45° |
Parts & tools for this job For 2014 Volkswagen Up!
- PARTWheel bearingSearch: Volkswagen Up! 2014 wheel bearing
- TOOLBearing puller kitSearch: wheel bearing puller kit
- PARTCV boot kitSearch: Volkswagen Up! 2014 cv boot kit
As an Amazon Associate we earn from qualifying purchases.