Workshop Manuals Factory service & repair Volkswagen
01 3 - Cyl. injection engine02 3 - Cyl. injection engine (1.0l, turbocharger)03 Troubleshooting, Mechanical Transmission04 5 - Speed manual gearbox 0DF05 5 - Speed automated transmission 0CT06 Brake systems07 Running gear, axles, steering08 Wheels and Tyres - Specifications09 Heating, air conditioning10 Electrical system11 Electrical: Communication12 General body repairs, interior13 General body repairs, exterior
Volkswagen Brazil-market up! (2014-2021)07 · Running gear, axles, steering
07 · Steering & suspension

Steering box - remove and install

Make
Volkswagen
Model
Up! Brazil-market up!
Year
2014–2021
Section
Steering box › Steering box - remove and install
Running gear, axles, steeringSteering box - remove and install

Steering box - remove and install

Electric system

W48-10004
Special tools and workshop equipment requiredBall joint puller 3287 ATorque wrench V.A.G 1331SW 17 fitting tool, open ring V.A.G 1331/10Torque wrench V.A.G 1332Gearbox and engine lift V.A.G 1383 A

Carry out the following tasks:

Remove

Disconnect the battery earth wire with the ignition switched off Electric systemRep. gr.27Battery; battery - connect and disconnect.

Unscrew the bolts (1) and remove the footwell lining (2).

N48-10670

loosen the joint cross (arrow) bolt (1) and remove the joint cross in the (direction of the arrow) .

N48-10671

Loosen the wheel bolts.

Raise the vehicle.

Disassemble the front wheels.

Loosen the ball joint nut (1) from the track rod (2), but do not remove it yet.

N48-10401

Warning Leave a few nut turns over the pin to protect the thread.

Remove the fastening ring from the auxiliary frame exhaust pipe.

N40-10585

Unscrew the steering box bolts (arrows) from the auxiliary frame.

N40-10586

Install the auxiliary frame → Chapter.

Lower the auxiliary frame using the gearbox and engine lift V.A.G 1383 A.

Remove the steering box backwards.

Install

Installation occurs in reverse sequence. The following must be observed:

Before assembling the steering box, the rack must be adjusted at the central position.

Displace the rack until the measurement (A) is reached.

S48-0131

Dimension (a) = 76.5 mm

  • After placing the steering box in the drive shaft, ensure the steering box sealing is not in contact with the assembly plate. The footwell opening must be properly sealed. Water and/or noises may enter.
  • Ensure that sealing surfaces are clean.
  • When replacing the steering box, also replace the track rod boots.

Before placing the auxiliary frame bolts, place the steering box in the auxiliary frame and insert the steering box bolts.

Screw the auxiliary frame → Chapter.

Screw the steering box into the auxiliary frame (arrows).

N40-10586

Screw the track rod to the steering arm.

Install the universal joint (1) on the steering box pinion.

N48-10671

Insert and tighten the new bolts (arrow).

Connect the battery earth wire Electric systemRep. gr.27Battery; battery - connect and disconnect.

Install the wheels and tighten → Chapter.

After the installation process and during a test drive, the steering wheel position must be checked.

If the steering wheel is crooked or if a new steering box was installed, the front axle camber must be checked and adjusted if necessary!

Check camber adjustment → Chapter.

Tightening torque

ComponentTightening torque
Steering wheel box in the auxiliary frameUse new bolts.50 Nm 180°
Track rod in the steering arm20 Nm 90°
Steering wheel box universal jointUse new bolts.20 Nm 180°

Parts & tools for this job For 2014 Volkswagen Up!

As an Amazon Associate we earn from qualifying purchases.