740 L4-2320cc 2.3L DOHC B234F (Can) (1992)
B11
Route cables to engine compartment
-
Route cables without housing receptacles to engine compartment through unused cutout in grommet under suspension strut brace.
-
Attach the round housing receptacles included in the new cable harness on the cables in the engine compartment.
-
Separate existing connectors on the cable between the A/C compressor and the receiver/drier.
-
Connect cables from the new cable harness to the separated connectors.
B12
Location of cable sheath opening
The cable sheath is cut to drain off condensation.
-
The cut conduit section should be placed at the lowest point along the route of the cable.
-
Use butyl tape to seal the grommet.
-
Use existing cable tie to clamp cables to firewall.
Function verification and information
B13
Check airing cycle is working
-
Connect battery lead and start car.
-
Turn on A/C system to start compressor. The A/C system starts if the temperature exceeds approx. 7°C (45°F).
-
Make up a cable (about 2 meters (6 ft.) in length) to connect battery positive terminal to control module connector. Connect to green cable, connector