850 T-5R L5-2.3L Turbo VIN 58 B5234T5 (1995)
6. Remove cover plate (3 x Torx T25 screws)(P6).
7. Remove air controls (2 x Torx T30)(P7).
8. Remove condenser (P8).
-
Disconnect pipes from condenser.
-
Disconnect high-pressure sensor connector.
-
Remove high-pressure sensor.
-
Disconnect condenser (4 screws), upper screws first.
-
The lower left-hand screw also holds two brackets remove these as well.
-
Lift condenser out.
-
Switch high-pressure sensor and rubber gasket to new condenser. Torque setting 10 Nm (7 ft.lb.).
Installation:
9. Install Condenser.(P9)
-
Pipe connections to condenser. Pipe connection torque settings: to condenser 20 Nm (15 ft.lb.), from condenser 20 Nm.
Note:
-
The bracket for the pressure hose to compressor is located between the condenser and cooler. Ensure pressure hose is clear of fan cover underside.
-
Use new O-rings lubricated with compressor oil.
10. Fill system with refrigerant and test for leaks. See: Service and Repair
11.Install;
-
Air guide.
-
Cover plate.
-
Fan cover.
-
Relays in relay shelf.
-
Control unit box fresh air hoses and vent.
-
Control unit box diagnostic unit.
-
Air intake hose and vent.
-
Battery negative cable.