940 SE L4-2320cc 2.3L SOHC Turbo VIN 87 B230FT (1991)
Housing Assembly HVAC: Service and Repair
ECC Unit Installation
1. Ensure that foam rubber seal and plate washer are in place before climate unit is lifted into position.
Check both at heater and evaporator.
2. Check that rubber gaiter is securely clamped at air intake.
3. Install heater and defroster ducts.
4. Place air distribution box in temporary position.
5. Lift in climate unit from right-hand side. Fit air distribution box and climate unit together.
-
Attach air vents to box.
-
Install knee bolster bracket.
6. Attach:
-
unit to mounting above vacuum tank
-
bracket to right-hand A-post.