S60 L5-2.4L VIN 64 B5244S6 (2003)
2. Screw M12 x 100 (x4)
3. Screws M12 x 50 (x2)
4. Washer (x4)
5. Washer, heat deflector plate
6. Screw (4.8 x 9.5 mm)
7. Seal (4x)
8. Blind rivet (x12)
9. Bracket
10. Pipe clamp
11. Flanged lock nut M8
12. Screw M8X25
13. Washer 24x13x7
Note! It is recommended that the work at steps 9, 13, 14 and 15 is carried out by two people.
Preparations
-
Take the bracket for the trailer connector, the pipe clamp, M8 screw and accompanying lock nut from the kit.
-
Install the bracket with the pipe clamp, the screw and the nut as illustrated. Tighten to 24 Nm (18 lbf.ft).
Note! The bracket must be located under the pipe clamp's level section.
-
Turn the ignition key to position 0. Remove the ignition key from the ignition switch.
NOTE! Wait at least five minutes before disassembling the connectors or removing other electrical equipment.
-
Install the cable harness connector for the tow hitch, according to the Installation Instructions for the appropriate cable harness.
-
Fold up the floor hatch.
-
Press the clips in the centre until a "click" is heard. Remove the clips.
-
Remove the plastic nut.
-
Repeat the operation on the right-hand side.