S60 L5-2.4L VIN 64 B5244S6 (2003)
-
Position the pipe and hose connections on the compressor
-
Tighten to 25 Nm.
-
Thread the screws on to the upper mountings on the air conditioning aggregate
-
Tighten to 10 Nm.
-
Position the pipe and hose connections on the compressor
-
Tighten to 25 Nm.
-
Thread the screws on to the upper mountings on the air conditioning aggregate
-
Tighten to 10 Nm.