S80 L5-2.5L Turbo VIN 59 B5254T2 (2004)
INTRODUCTION
-
NOTE! Read through the whole installation instruction before starting the work.
-
The illustrations display the procedure in order of operation. The order of operation is repeated in the text section.
Towbar, hitch, base unit
Installation of the base unit
Tightening the base unit to the towbar hitch