volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Wastegate Actuator|Testing and Inspection|Page 7996 > < Wastegate Actuator|Testing and Inspection|Page 7994
Page 5
background image

Install the split pin on the lever.
Tighten the locknut on the lever.
Remove the test equipment.
Insert the hose upwards following previous routing.
Install the lower splash guard.
Lower the car.

Checking / setting turbo2 pressure regulator

Preparation

Remove

-

the turbocharger (TC) intake pipe

-

the charge air pipe from the turbocharger (TC)

-

the heat deflector plate over the turbocharger (TC).

Connecting test equipment

-

Connect test equipment. See Connecting test equipment

Checking and adjusting push rod

-

Check and adjust the push rod. See Checking and adjusting push rod.

Wastegate Actuator|Testing and Inspection|Page 7996 > < Wastegate Actuator|Testing and Inspection|Page 7994