volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Bushing Front Sub-Frame, Replacing|Page 23728 > < Bushing Front Sub-Frame, Replacing|Page 23726
Page 16
background image

-

Install the hose for the EVAP canister.

-

Install the fuel line for the engine block heater (if applicable).

Installing the screws for the engine mounting to the engine 

Reinstall the screws holding the engine mounting to the engine. Tighten to 35 Nm. Angle-tighten 90 degrees.

NOTE:  Use new screws.

Installing the protective plate 

Bushing Front Sub-Frame, Replacing|Page 23728 > < Bushing Front Sub-Frame, Replacing|Page 23726