l
| Valve body installed or removed. |
–
| Remove conductor strip with lever for conductor strip -3373-. |
–
| Apply lever for conductor strip -3373- as far as it will go under connectors for solenoid valves. |
–
| Detach connector in direction of -arrow-. |
–
| Remove securing bolt -1- for leadthrough. |
–
| Push leadthrough out of gearbox housing from outside to inside. |
–
| Unscrew bracket for 10-pin connector, disengage connector. |
Note If the locking tabs on the solenoid valves are damaged, the valve body must be renewed. |
–
| Guide out wiring to 10-pin connector when removing. |
|
|
|