GS 350 RWD V6-3.5L (2GR-FSE) (2007)
b. Turn the actuator clockwise 40° until a click is felt.
NOTE: Do not turn the actuator more than 40°.
2. INSTALL SHOCK ABSORBER CAP UPPER
a. Connect the connector.
b. Install the front shock absorber cap upper with the 3 nuts.
Torque: 20 N.m (202 kgf.cm, 15 ft.lbf)
3. INSTALL ENGINE ROOM SIDE COVER LH
4. INSTALL ENGINE ROOM SIDE COVER RH
5. INSTALL COOL AIR INTAKE DUCT SEAL
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.