IS 250C V6-2.5L (4GR-FSE) (2011)
(i) Install the transmission control shaft lever RH with the nut and washer.
Text in Illustration
Torque : 16 Nm (163 kgf-cm, 12 ft-lbf)
(j) Connect the park/neutral position switch connector.
Text in Illustration
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY See: Transmission and Drivetrain/Automatic
Transmission/Transaxle/Shifter A/T/Service and Repair/Removal and Replacement/A960E Automatic Transmission/Shift Lever
Assembly/Installation
3. INSPECT SHIFT LEVER POSITION See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Shifter A/T/Testing and
Inspection/A960E Automatic Transmission/Shift Lever Assembly/On-Vehicle Inspection
4. ADJUST SHIFT LEVER POSITION See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Shifter A/T/Adjustments/A960E
Automatic Transmission
5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY See: Testing and Inspection/A960E Automatic Transmission/On-Vehicle
Inspection