mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Sub Zero Starting Assist Device - Discontinued|Page 1714 > < Sub Zero Starting Assist Device - Discontinued|Page 1712
Page 5
background image

1. Install the check valve and the new gasket.
2. Install the air control valve so that the check valve does not fall from the intake manifold.

3. Connect the couplers of the split air solenoid valve and the port air solenoid valve.

Tightening torque:  7.8-11 N.m (80-110 cm-kg, 69-95 in-lb)

Primary Fuel Injectors and Distribution Pipe
1. Apply engine oil to the 0-ring of the air bleed socket.

2. Insert the mixing plate into the intermediate housing with plate's tab faced upward.
3. Insert the air bleed socket and injector insulator into the intermediate housing.
4. Apply engine oil to the injector 0-rings, and install the primary fuel injectors.

5. Install the fuel distribution pipe and the insulator.

Tightening torque:  19-25 N.m (1.9-2.6 m-kg, 14-19 ft-lb)

6. Connect the fuel hoses.
7. Connect the injector couplers.
Throttle and Dynamic Chamber

1. Install the throttle and dynamic chamber assembly and the new gasket.

Tightening torque:  19-25 N.m (1.9-2.6 m-kg, 14-19 ft-lb)

Sub Zero Starting Assist Device - Discontinued|Page 1714 > < Sub Zero Starting Assist Device - Discontinued|Page 1712