l
| Note the tightening torques, assembly overview → Chapter |
Installation is carried out in the reverse order. When installing, note the following: |
–
| Insert the O-rings -1, 4- at the connecting pipes -2, 3- to the evaporator. |
Note t
| There are different versions of the expansion valve (identical housing but different characteristic control curve); therefore it is important to observe the correct assignment → Electronic parts catalogue. |
t
| Moisten the ring seals with refrigerant oil before inserting them. |
t
| Check the refrigerant pipes to the evaporator for contamination and damage. |
t
| Pay attention to correct positioning of the O-rings at the evaporator connecting pipes. |
|
|
|