Satellite carrier control measurement |
–
| Fit tool -T20026- on the gearbox casing with a dial gauge. Locate the end of the dial gauge on the satellite carrier shaft screw. |
–
| Pull the satellite carrier shaft in the direction of the dial gauge. |
–
| Take note of the measurement obtained on the dial gauge. |
Minimum clearance = 0.23 mm |
Maximum clearance = 0.37 mm |
Note! If the satellite carrier has been adjusted with brake -B1- and the free wheel removed, brake -B1- must be fitted before fitting the satellite carrier → Chapter. |
|
|
|