–
| Dampen the new O-ring -3- with coolant. |
–
| Position the coolant pump -4-. Assembly position: the lid of the casing indicates downwards. |
–
| Position the coolant pump -4- in the engine block and tighten the fastening bolts -5-. |
–
| Tighten the bolt -1- that fastens the rear protector of the toothed belt -2- to the cylinder head. |
–
| Assembly of the toothed belt and distribution timing adjustment → Chapter. |
–
| Install the tensioning device for the ribbed belt. |
|
|
|