This operation is described for a vehicle with X 16 XEL engine; for other versions, proceed analogously. Fluid leaks during removal of lines and hoses - place collecting basin underneath. Take care to ensure snag- and kink-free routing of hydraulic hoses and lines during installation; avoid chafing or contact with hot or rotating parts.
Remove, Disconnect
Remove front panelling - see operation "Front Panelling, Remove and Install" in Group "A".
Detach cooling loop union nuts (1). Loosen and remove cooling loop from fastening elements (2).
Install, Connect
Insert cooling loop into fastening elements and tighten cooling loop union nuts - tightening torque 28 Nm/20.5 lbf. ft.
Install front panelling - see operation "Front Panelling, Remove and Install" in group "A".
Install, Connect
Charge and bleed hydraulic system - see operation "Hydraulic System, Charge and Bleed".