Astra G
Oil Pan, Remove and Install Remove
Clean Clean sealing surfaces and remove gasket residues. Install
Caution Installation sequence: 1. Moderately tighten all bolts. 2. Tighten bolts on cylinder block and oil pump – tightening torque 10 Nm / 7.5 lbf. ft. 1) 3. Tighten bolts on transmission housing – 40 Nm / 29.5 lbf. ft. Install Attach oil drain bolt to oil pan with new seal ring. For version with hexagonal bolt (metal seal ring) – tightening torque 45 Nm / 33 lbf. ft. For version with inner Torx bolt (rubber seal ring) – tightening torque 14 Nm / 10 lbf. ft. Attach front exhaust pipe to exhaust manifold and rear muffler together with catalytic converter and centre muffler. For version with dynamic oil level control: Connect wiring harness plug for dynamic oil level control – ensure correct cable routing. For X 18 XE1: Connect wiring harness plug for oxygen sensor – ensure correct cable routing. For Z 14 XE, Z 16 XE, Z 16 YNG, Z 18 XE, Z 18 XEL: Connect wiring harness plug for mixture regulation oxygen sensor – note correct routing of cables. Fill engine oil up to "MAX" at dipstick. 1 ) Clean thread and install bolts with screw locking compound (red). The installation time including torque checking is max. 10 min. |
||||||||
|