Replace connector linkage for folding roof lock -
L67
Remove
|
1. |
Remove moulded headlining (1)
• |
Open velcro 2x (arrows)
|
|
|
|
2. |
Detach joint rod (1)
• |
Unclip 2x ball heads (2)
|
|
|
Remove
3. |
Attach joint rod
• |
Place the lock, front on the catch ( push onto ball head).
|
• |
Clip in lock linkage both sides
Note: If installation
problems occur, release 2x bolts on lock linkage and clip in lock
cylinder and lock at the front under slight pretension.
|
|
4. |
Adjust linkage if needed
|
5. |
Install moulded headlining
• |
Connect 2x Velcro fasteners
|
|
|