Parcel shelf - align or adjust - L67
Adjust
|
1. |
Check parcel shelf gap (1)
Note: If the gap does
not agree with that in the table, the following is to be carried
out.
I
|
II
|
III
|
IV
|
8±2
|
6±1,5
|
8±2
|
8±2
|
Note: Dimensional data
in millimetres!
|
|
2. |
Open steel folding top
|
3. |
Lift parcel shelf with roof actuator
• |
Close steel cover until the parcel shelf is lifted
|
|
|
4. |
Loosen parcel shelf (1)
Note: Only the left
side of the parcel shelf is shown to improve the illustration.
Note: Loosen attachment
points only so much that light press allows it to slide.
• |
Loosen 4x top clips (2)
|
• |
Loosen 4x lower bolts (3)
|
|
5. |
Align parcel shelf
• |
Tighten 4x top bolts 2.5 Nm
|
• |
Tighten 4x lower bolts 8 Nm
|
|
|
|
6. |
Check parcel shelf gap (1)
Note: Repeat the
proceedure if the gap is out of the tolerance.
I
|
II
|
III
|
IV
|
8±2
|
6±1,5
|
8±2
|
8±2
|
Note: Dimensional data
in millimetres!
|
|
7. |
Close the parcel shelf using the roof actuator
|
|