Replace lock cylinder hydraulic pipeline (flow /
return) -left side -L67
Remove
1. |
Remove folding roof center
Note: Removal of center
folding roof seal not required.
|
2. |
Detach luggage compartment panelling, side - left side
|
3. |
Remove inner panelling of lower rear end panel
|
4. |
Loosen folding roof hydraulic cylinder lock
|
|
5. |
Loosen hydraulic pump (1)
Note: Leave hydraulic
pipeline (3) attached to the hydraulic pump
• |
Unscrew 4x screw (arrows)
|
• |
Disconnect 2x wiring harness plugs (2)
|
|
|
|
6. |
Detach cyliner hydraulic pipeline (1)
Note: The pipeline run
is shown unattached in order to improve illustration.
• |
Detach hydraulic pipeline (2)
– |
Unscrew bolt (1)
Note: Seal hydraulic
lines and cylinder against leaks using suitable aids.
|
|
|
7. |
Detach hydraulic pump pipeline
Note: Follow hydraulic
pipeline run starting from cylinder.
• |
Loosen pipeline retaining plate
|
• |
Unclip hydraulic pipeline from line guide main bearing and
remove line guide shell upwards
Note: Seal hydraulic
lines and hydraulic pump against leaks using suitable aids.
|
|
8. |
Remove hydraulic pipeline
• |
Detach 10x cable ties (arrows)
|
|
|
Install
9. |
Provionally place hydraulic pipeline
• |
Pull hydraulic pipeline from above through main bearing line
guide until hydraulic pump
|
• |
Place hydraulic pipeline on C-pillar above roof cinematic until
lock cylinder position
|
|
10. |
Attach hydraulic pump pipeline
• |
Attach pipeline retaining plate
|
|
11. |
Attach cyliner hydraulic pipeline
• |
Attach hydraulic pipeline
|
|
12. |
Tighten hydraulic punp
• |
Attach 2x wiring guides
|
• |
Connect 2x wiring harness plugs
|
|
13. |
Attach folding roof hydraulic cylinder lock
|
14. |
Check and correct hydraulic pump fill level, function test,
test again and correct if necessary.
|
15. |
Attach luggage compartment panelling, side - left side
|
16. |
Install folding roof center
|
|