Operational procedure
|
Paint stage
|
Products
|
Notes
|
|
I
|
II
|
III
|
|
|
Clean
|
x
|
x
|
x
|
Antistatic / silicone remover
|
Spray on using pump atomiser and dry well using highly absorbent
cloth.
|
Sand
|
x
|
x
|
x
|
Dry
|
Sand out defect area, P180 grain. Roughen remaining area using
P280.
|
Clean
|
x
|
x
|
x
|
Aqueous degreaser
|
See clean
|
|
|
|
|
|
|
Putty application
|
x
|
–
|
x
|
Polyester universal putty
|
Apply to bare metal areas.
|
Dry
|
x
|
–
|
x
|
Infrared lamp
|
Dry for 5 minutes.
|
|
|
|
|
|
|
Sand
|
x
|
–
|
x
|
Dry
|
Only sand polyester universal putty when dry.
|
|
|
|
|
|
|
Clean
|
x
|
–
|
x
|
Aqueous degreaser
|
Spray on using pump atomiser and dry well using highly absorbent
cloth.
|
Prime
Apply filler
|
x
|
–
|
x
|
2C EP primer-surfacer or 2C HS Multi-filler
|
Apply two individual feathering coats with 5 min intermediate
drying time to welded joints and areas subject to stone
chipping.
For new parts, spray 2C HS multifiller wet on
wet
|
Sand
|
x
|
–
|
x
|
Dry
|
Use eccentric P400 to P500
|
|
|
|
|
|
|
Clean
|
x
|
–
|
x
|
Aqueous degreaser
|
Spray on using pump atomiser and dry well using highly absorbent
cloth.
|
Spray top coat paint
|
x
|
x
|
x
|
VOC coat
100 parts of coat
50 parts of hardener
25 parts of thinner
|
Spray one thin layer. Setting time 1 to 3 minutes. Final
spraying with one more layer. Setting time 1 to 3 minutes before
oven drying.
|