ABS-2E:
Ground lead to control unit K 50
to terminals
4, 9, 21 and 26
Signal lead to control unit K 50
to terminals
5, 8, 11 and 24
ABS-2EH with ETC:
Ground lead to control unit U 4.8
to terminals
5, 6, 9 and 21
Signal lead to control unit U 4.8
to terminals
4, 7, 10 and 20
ABS-2EH without ETC:
Ground lead to control unit U 4.8
to terminals
2, 5, 7 and 14
Signal lead to control unit U 4.8
to terminals
4, 6, 10 and 13
|
|