Positioning
- Make
- Alfa Romeo
- Model
- 155 Factory Service Manual
- Year
- 1992–1998
- Section
- Preparation › Positioning
BodyworkPositioning
- Operating on a bench, cut the new door sill with a jig saw remembering to leave enough marin for overlapping.
- Trace the trim and using a 5 mm. bit, drill as indicated in the illustration.
- Clean the welding areas using a rotating brush.
- Spread the areas indicated in the illustration with Type B electroweldable protection.
- Spread the areas indicated in the illustration with Type A electroweldable paste.
- Part 1
- Part 2
- Part 3
- Part 4
Positioning
- Position the sill and overlap as indicated in the illustration.
- Using a jig saw, trim the sheet metal and remove the excess parts without damaging the underlying parts.
- Part 1
- Part 2
Parts & tools for this job For 1992 Alfa Romeo 155
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Alfa Romeo 155
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.