Workshop Manuals Factory service & repair Aston Martin
01 00 Introduction02 01 Body system03 02 Frame and mounting04 03 Engine05 04 Suspension06 05 Driveline07 06 Brake system08 07 Transmission09 08 Clutch10 09 Exhaust11 10 Fuel12 11 Steering13 12 Climate control14 13 Information, gauge and warning15 14 Power supply16 15 Vehicle entertainment17 16 Vacuum distribution18 17 Lighting19 18 Electric distribution and electronic control20 19 Electronic features21 20 Appendix and glossary22 Circuit diagrams23 Squeaks and rattles repair manual24 Bluetooth system (training guide)25 On board diagnostics (EOBD)26 Service bulletins
Aston Martin V8 Vantage Factory Workshop Manual (2005-2010)04 · 03 Engine
04 · Engine

Maintenance

Make
Aston Martin
Model
V8 Vantage Factory Workshop Manual
Year
2005–2010
Section
Engine Cranking System › Maintenance
03 EngineMaintenance

Maintenance

Starter Motor-Renew

Repair Operation Time (ROT)
ItemCode
Starter motor-Renew03.06.AB

Removal

  1. Remove RH exhaust manifold (see Workshop Manual procedure 09.00.CA Manifold - Exhaust - RH - Renew).
  2. Switch battery isolation switch ‘OFF’.
  3. Remove battery cable from starter motor.
  4. Disconnect solenoid multiplug from starter motor (see Figure 1).
Starter motor with disconnected solenoid multiplug and battery cable.
  1. Remove starter motor bolts (x2) (see Figure 2).
Close-up of starter motor bolts being removed.

Installation

  1. Install starter motor bolts (x2).
  2. Connect solenoid multiplug to starter motor.
  3. Install battery cable from starter motor.
  4. Switch battery isolation switch ‘ON’.
  5. Install RH exhaust manifold (see Workshop Manual procedure 09.00.CA Manifold - Exhaust - RH - Renew).

Parts & tools for this job For 2005 Aston Martin V8 Vantage

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.