Procedure
- Make
- Audi
- Model
- A7 Sportback
- Year
- 2010–2018
- Section
- Centre differential › Procedure
Servicing 7-speed dual clutch gearbox 0CJ, 0CL, 0CKProcedure
Procedure
Outer A-pillar cut out ChapterWing mounting flange cut out ChapterUpper inner A-pillar removed (partial renewal) ChapterIntermediate piece removed → ChapterPermitted separating cuts on complete side panel → Chapter.
Drill out original joint using spot weld breaker.

Remove remaining material using compact angle grinder.

Lower inner A-pillar
Drill holes for SG plug weld seam, 8 mm ∅ using drill.

Note
- Due to the different types of steel and panel thicknesses employed, one of the resistance spot welding units listed in this manual and approved by Audi must be used to ensure correct results when spot welding.
Weld in lower inner A-pillar using shielded arc welding equipment: SG plug weld seam.
Weld in lower inner A-pillar using resistance spot welder: RP spot weld seam.

Parts & tools for this job For 2010 Audi A7
- PARTClutch kitSearch: Audi A7 2010 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Audi A7 manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.