Procedure
- Make
- Audi
- Model
- A7 Sportback
- Year
- 2010–2018
- Section
- Centre differential › Procedure
‹ Prev C-pillar reinforcement - Renewal (Saloon and Avant identical)Next › Rear wheel housing - Partial renewal
Servicing 7-speed dual clutch gearbox 0CJ, 0CL, 0CKProcedure
Procedure
Side panel removed (Saloon) ChapterSide panel removed (Avant) → ChapterSeparate original joint using spot weld breaker.

Separate original joint using spot weld breaker.

Remove remaining material using compact angle grinder.

- Upper C-pillar reinforcement
- Lower C-pillar reinforcement
Drill holes for SG plug weld seam, 8 mm ∅ using drill.

Note
- Due to the different types of steel and panel thicknesses employed, one of the resistance spot welding units listed in this manual and approved by Audi must be used to ensure correct results when spot welding.
Weld in lower C-pillar reinforcement using shielded arc welding equipment: SG plug weld seam.
Weld in lower C-pillar reinforcement using resistance spot welder: RP spot weld seam.

Weld in upper C-pillar reinforcement using resistance spot welder: RP spot weld seam.

‹ Prev C-pillar reinforcement - Renewal (Saloon and Avant identical)Next › Rear wheel housing - Partial renewal
Parts & tools for this job For 2010 Audi A7
- PARTClutch kitSearch: Audi A7 2010 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Audi A7 manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.