Test sequence
- Make
- Audi
- Model
- A8 D2
- Year
- 1994–2002
- Section
- Servicing secondary air system › Test sequence
Test sequence
Note
- The described procedure shows cylinder bank 2 (left-side). The procedure for cylinder bank 1 (right-side) is the same.
Unclip cover (1) for air duct (left-side) on lock carrier in engine compartment.

Remove air duct (2).
Disconnect vacuum hose to combination valve for secondary air.

Connect the hand vacuum pump V.A.G 1390 to combination valve that is to be checked.
Disconnect pressure hose at combination valve for secondary air and connect an auxiliary hose in its place.
The hose must fit securely on hose flange for secondary air.Blow gently into auxiliary hose (arrow) (do not use compressed air).
The relevant combination valve must be closed; blowing through must not be possible.Create vacuum using hand-operated vacuum pump.
The relevant combination valve should open; it should now be possible to blow through the hose.If the combination valve does not open:
Renew combination valve → Chapter and → Chapter.
Parts & tools for this job For 1994 Audi A8
- PARTEngine gasket setSearch: Audi A8 1994 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.