Procedure
- Make
- Audi
- Model
- Q3 8U
- Year
- 2011–2018
- Section
- Bevel box › Procedure
Procedure
Remove paint and oxide layer from rivet head and attachment point for earth clamps using compact angle grinder or brush grinder VAS 6446.
Attach earth clamps as close as possible to rivets.
Using dent removal system VAS 852 001, weld on weld stud VAS 852 001/1 oder VAS 852 001/2 to separate riveted joint.
Separate clinched joint using compact angle grinder.

Remove remaining material using compact angle grinder.

- Rear upper cross panel
- 2-component epoxy adhesive DA 180 A00 A2
- Aluminium primer DA 009 801
- Applicator D 009 500 25
- Cleaning solution D 009 401 04
- Solid aluminium rivet 6 x 10 mm
- Pop rivet N 909 236 01
Drill holes for pop rivets N 909 236 01 using drill (5 mm ∅).
Roughen bonding surface using a clean sanding disc (grit size P 80 or P 100).
Clean new part with cleaning solution D 009 401 04.

Warning Pre-treatment applies to old flange only.
Use clean brush to remove sanding dust.
Clean bonding surfaces with cleaning solution D 009 401 04.
Treat flanges with silicate stone D 009 800 and holder V.A.G 1931.
Apply a thin coat of aluminium primer DA 009 801 using applicator D 009 500 25 and allow to flash off.
Apply 2-component epoxy adhesive DA 180 A00 A2 to entire riveting area and wheel housing using double cartridge gun VAS 6453.
Set pop rivets N 909 236 01 using compact riveter VAS 6792.

Rivet in cross panel using rechargeable riveter VAS 843 001 or compact booster VAS 6790 with attachment for 4 x 10 mm solid aluminium rivetChapter.

Parts & tools for this job For 2011 Audi Q3
- PARTClutch kitSearch: Audi Q3 2011 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Audi Q3 manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.