Exploded view of refrigerant lines
- Make
- Audi
- Model
- R8 Mk1
- Year
- 2007–2015
- Section
- Servicing refrigerant circuit › Exploded view of refrigerant lines
‹ Prev Servicing refrigerant circuitNext › Detaching refrigerant lines at air conditioner compressor/attaching - vehicles with 8-cyl. engine
Heating, air conditioningExploded view of refrigerant lines
Exploded view of refrigerant lines

Front end AnchorIIComponent group “II”
Body, front AnchorIIIComponent group “III”
Body, rear AnchorIVComponent group “IV”
Engine compartment Anchor
Note
- Exploded view of refrigerant lines → Chapter

- O-rings
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Refrigerant line
Connecting pipe between condenser 1 (left) and condenser 2 (right) - Bolts
Tightening torque 9 Nm - Refrigerant line
To evaporator - Condenser 2
Right side of vehicle
Detaching and attaching refrigerant line → Chapter
Removing and installing → Chapter - Bolts
Tightening torque 9 Nm - Holder
For refrigerant line - Refrigerant line
To evaporator - Union nut
Tightening torque 15 Nm - O-ring
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Restrictor
Replace; for version, refer to Electronic parts catalogue - O-ring
Moisten slightly with refrigeration oil before fitting - Refrigerant line
From air conditioner compressor - Holder
For refrigerant line - Bolts
Tightening torque 9 Nm - Refrigerant pressure and temperature sender G395
Removing and installing → Chapter - Condenser 1
Left side of vehicle
Detaching and attaching refrigerant line → Chapter
Removing and installing → Chapter - O-rings
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Bolts
Tightening torque 9 Nm - Refrigerant line
Connecting pipe between condenser 1 (left) and condenser 2 (right) - Refrigerant line
From air conditioner compressor - Refrigerant line
Connecting pipe between condenser 1 (left) and condenser 2 (right) - Cable tie
- Abrasion guard
Note
- Exploded view of refrigerant lines → Chapter

- Refrigerant lines
From air conditioner compressor to condenser 1 (left) - Bolt
Tightening torque 9 Nm - O-ring
For refrigerant lines
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Bolt
Tightening torque 9 Nm - Refrigerant line
From condenser 2 (right) to evaporator - Refrigerant line
From air conditioner compressor to condenser 1 (left) - Bolt
Tightening torque 9 Nm - Refrigerant line
From condenser 2 (right) to evaporator - Refrigerant line
From air conditioner compressor to condenser 1 (left) - Bolt
Tightening torque 9 Nm - Retaining clip
- Refrigerant line
From condenser 2 (right) to evaporator - Bolt
Tightening torque 9 Nm - Connections for coolant lines
From engine to air conditioning unit
With supply pipe to left heat exchanger, supply pipe to right heat exchanger and central return pipe
In passenger compartment above transmission tunnel - O-rings
For coolant pipes
Replace; for version, refer to Electronic parts catalogue - Connections for coolant lines
From heat exchanger to engine - Refrigerant line
Supply from condenser 2 (right) to evaporator
In passenger compartment above transmission tunnel - Refrigerant line
Return from evaporator to reservoir
In passenger compartment above transmission tunnel - O-rings
For refrigerant lines
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Refrigerant line
Return from evaporator to reservoir
In passenger compartment above transmission tunnel - Bolt
Tightening torque 9 Nm - Refrigerant line
Supply from condenser 2 (right) to evaporator
In passenger compartment above transmission tunnel - Refrigerant line
Return from evaporator to reservoir
In transmission tunnel - O-ring
For refrigerant lines
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Bolt
Tightening torque 9 Nm - Refrigerant line
Return from evaporator to reservoir
In transmission tunnel - O-ring
For refrigerant lines
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Refrigerant line
Supply from condenser 2 (right) to evaporator
In transmission tunnel to passenger compartment - Bolt
Tightening torque 9 Nm
Note
- Exploded view of refrigerant lines → Chapter
- Connection point in refrigerant lines at rear for vehicles with 10-cyl. engine → Fig.

- Nuts
Tightening torque 9 Nm - Holder
- Refrigerant line
From evaporator to reservoir - Refrigerant line
From air conditioner compressor to condenser 1 (left) - Bolt
Tightening torque 9 Nm - Refrigerant line
From air conditioner compressor to condenser 1 (left) - Refrigerant line
From evaporator to reservoir - Holder
For refrigerant lines - Refrigerant line
From air conditioner compressor to condenser 1 (left) - Refrigerant line
From evaporator to reservoir - Bolt
Tightening torque 9 Nm - Nuts
Tightening torque 9 Nm - Bolts
Tightening torque 9 Nm - Refrigerant line
From evaporator to reservoir - Refrigerant line
From air conditioner compressor to condenser 1 (left) - O-rings
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Refrigerant line
From air conditioner compressor to condenser 1 (left)

Note
- Exploded view of refrigerant lines → Chapter
- The following illustration shows the design of the refrigerant circuit components for an 8-cyl. engine. There are certain differences on vehicles with a 10-cyl. engine (e.g. outlets for the service connections not soldered to the refrigerant line but rather part of an additional line bolted to the refrigerant line, additional connection in the refrigerant lines to the reservoir) Electronic parts catalogue.

- Bolt
Tightening torque 25 Nm - Refrigerant line
From reservoir to air conditioner compressor - O-ring
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Air conditioner compressor
Different versions Electronic parts catalogue
Removing and installing: Vehicles with 8-cyl. engine → Chapter, vehicles with 10-cyl. engine → Chapter - Refrigerant line
From air conditioner compressor to condenser 1 (left)
With branch to service connection on high-pressure end
Vehicles with 10-cyl. engine, with separate service pipe Fig.NoteDepending on the vehicle model and type of refrigerant line, the outlet for the service connection may be soldered directly to the refrigerant line or may be part of an additional line (bolted to the refrigerant line) Electronic parts catalogue. - Bolt
Tightening torque 22 Nm - Service connection on high-pressure end
Different versions (with primary sealing valve or Schrader valve) depending on refrigerant line; distinguishing features Air conditioner with refrigerant R134aRep. gr.87General information on air conditioner (air conditioner with refrigerant R134a, general information on air conditioner).
For measurement, drainage and charging Air conditioner with refrigerant R134aRep. gr.87Refrigerant circuit (air conditioner with refrigerant R134a, refrigerant circuit, working with air conditioner service station).
Use an adapter from the Adapter set for service connections T10364 for example for removing and installing the service connection or valve insert with the refrigerant circuit drained.
Depending on the vehicle model and type of refrigerant line, the outlet for the service connection may be soldered directly to the refrigerant line or may be part of an additional line (bolted to the refrigerant line) Electronic parts catalogue. WARNINGThe refrigerant circuit must be drained before removing the service connections (the connection has no valve).
Fitting location ItemNoteOn the Audi R8 Spyder, the left service flap (for the air conditioner) must be removed from the engine compartment trim of the convertible roof compartment to gain access to the service connections Rep. gr.53Removal of the service line on the Audi R8 Spyder involves taking out the engine compartment trim of the convertible roof compartment Rep. gr.53 - O-ring
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Bolt
Tightening torque 25 Nm - Reservoir
Removing and installing → Chapter - O-ring
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting - Refrigerant line
From reservoir to air conditioner compressor - Bolt
Tightening torque 9 Nm - Bolt
Tightening torque 9 Nm - Refrigerant line
From evaporator to reservoir - Service connection on low-pressure end
Different versions (with primary sealing valve or Schrader valve) depending on refrigerant line; distinguishing features Air conditioner with refrigerant R134aRep. gr.87General information on air conditioner (air conditioner with refrigerant R134a, general information on air conditioner).
For measurement and drainage Air conditioner with refrigerant R134aRep. gr.87Refrigerant circuit (air conditioner with refrigerant R134a, refrigerant circuit, working with air conditioner service station).
Use an adapter from the Adapter set for service connections T10364 for example for removing and installing the service connection or valve insert with the refrigerant circuit drained.
Depending on the vehicle model and type of refrigerant line, the outlet for the service connection may be soldered directly to the refrigerant line or may be part of an additional line (bolted to the refrigerant line) Electronic parts catalogue. WARNINGThe refrigerant circuit must be drained before removing the service connections (the connection has no valve).
Fitting location ItemNoteOn the Audi R8 Spyder, the left service flap (for the air conditioner) must be removed from the engine compartment trim of the convertible roof compartment to gain access to the service connections Rep. gr.53Removal of the service line on the Audi R8 Spyder involves taking out the engine compartment trim of the convertible roof compartment Rep. gr.53 - Bolt
Tightening torque 9 Nm - O-ring
Replace; for version, refer to Electronic parts catalogue
Moisten slightly with refrigeration oil before fitting

Warning The refrigerant circuit must be drained before removing the service pipe.
- Removing and installing service pipe → Chapter
Note
- On the Audi R8 Spyder, the left service flap (for the air conditioner) must be removed from the engine compartment trim of the convertible roof compartment to gain access to the service connections Rep. gr.53
- Removal of the service pipe on the Audi R8 Spyder involves taking out the engine compartment trim of the convertible roof compartment Rep. gr.53
‹ Prev Servicing refrigerant circuitNext › Detaching refrigerant lines at air conditioner compressor/attaching - vehicles with 8-cyl. engine
Parts & tools for this job For 2007 Audi R8
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Audi R8 2007 cabin filter
As an Amazon Associate we earn from qualifying purchases.